Project

DAWN KLCC

BORED PILE & EARTHWORKS

ARICIA

EARTHWORKS, ROCK PROBING, SOILDIER PILE & BORED PILE

AVANTRO

EARTHWORKS, CONTIGUOUS BORED PILE & BORED PILE

IWSS MELAWATI

MICRO PILE

PPAM

BORED PILES

COUNTRY HEIGHTS

BUNGALOW CONSTRUCTION

BANDAR UTAMA CITY

BORED PILES, MICRO PILES, HAND-DUG CAISSON

IWSS

BORED PILING WORKS (REVERSED CIRCULATION DRILLING METHOD)

MRT Station Sungai Buloh

BORED PILING WORKS

Nadayu

BORED PILING WORKS

Mines Resort City

EARTHWORKS, SOIL NAIL, BORED PILES, CBP, SHEET PILING, INJECTION PILING & PILE CAP WORKS

Sunway Velocity

BORED PILES, CBP & Strutting

Batuan Tengah

MARINE PILING WORKS

Kiara Hill 2

ROCK BOLT, GUNITNG & RC RETAINING

MKN

PRE-BORED & DRIVEN PRECAST PILES

Kuala Kubu Bharu

SOIL NAIL, GEOCELL & HYDROSEEDING

Kiara 3

CONTIGUOUS BORED PILES & GROUND ANCHOR

Delta Height

MICRO PILES (UNDER PINING) & SOLDIER PILE WALL

Completed Projects

Project TitleScope of WorksDeveloper /
Main-Con
Contract SumContract Period
PROPOSED MICROPILING WORKS & SLAB CONSTRUCTIONAT AT BUKIT FRAZER
RESORTS, PAHANG
Micro PilesBINA VARIAMAS SDN
BHD
295,738.00July 2008 - Aug 2008
PROPOSED MICROPILING WORKS FOR NO: 82, LORONG BULUH PERINDU 2,BANGSARMicro PilesPLUS DEGREE
CONSTRUCTION SDN
BHD
312,036.00Aug 2008 - Oct 2008
CADANGAN MEMBINA 1 UNIT RUMAH BERASINGAN 2 TINGKAT DI ATAS LOT 487,
COUNTRY HEIGHTS D'SARA
Micro Piles, Soil NailMR TAN KEH HENG520,000.00Sept 2008 - Jan 2009
PROPOSED MICROPILING WORKS & SOIL NAILING FOR LOT 181, COUNTRY HEIGHTS
DAMANSARA
Micro PilesMEGA PALM SDN BHD200,700.00Dec 2008 - Feb 2008
CADANGAN PEMBANGUNAN DI ATAS SEBAHAGIAN LOT 26477, JALAN BUKIT BELACAN,
MUKIM AMPANG DAERAH HULU LANGAT
Soil Nail, GunitingPERUNDING JURUWAS
S/B
200,000.00Jan 2009 - Feb 2009
CADANGAN PEMBANGUNAN 249 UNIT YANG MENGANDUNGI 3 BLOK KONDOMINIUM
BERSERTA 3 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DAN 1 BLOK DUPLEX
Micro PilesSunway South Quay Sdn
Bhd
445,375.55Jan 2009 - Apr 2009
CADANGAN MEROBOHKAN BANGUNAN SEDIADA DAN MEMBINA SEMULA BANGUNAN DI
ATAS LOT PT26A (NO426) SEKSYEN 52, JALAN PUDU
Micro PilesSYARIKAT POH FAH298,131.00Feb 2009 - Mar 2009
CONSTRUCTION OF 1 UNIT 7 STOREY SHOP OFFICE WITH 1 FLOOR SUB-BASEMENT
CAR PARK ON LOT 295 & 296, TENGKAT TONG SHIN, OFF JALAN BUKIT BINTANG, K.L
Micro PilesMAWAR ABADI (M) S/B594,000.00Feb 2009 - June 2009
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN PUSAT LATIHAN KESEDAR SERTA
KERJA-KERJA YANG BERKAITAN DI GUA MUSANG
Micro PilesMJ UTAMA BINA S/B514,715.00Feb 2009 - July 2009
CADANGAN MEMBINA 1 UNIT RUMAH BERASINGAN 3 TINGKAT DIATAS LOT 330
COUNTRY HEIGHTS DAMANSARA
Micro PilesYCM CONSTRUCTION
S/B
216,292.00Mar 2009 - Apr 2009
Proposed Bungalow at Lot 484 Country Heights Damansara, Kuala Lumpur for Dato' Leong Kam
Heng
Micro Piles, Soil Nail,
Guniting, RC Works
Dato' Leong Kam Heng2,598,050.00Mar 2009 - May 2010
CADANGAN MEMBINA DAN MENYIAPKAN PERUMAHAN ORANG ASLI DI ATAS TANAH
KERAJAAN DI SG.BILUT, RAUB PAHANG
Micro PilesMADANI CORPORATION
S/B
400,924.00Apr 2009 - June 2009
PROPOSED SOIL NAIL WORKS AT LOT 48733, MUKIM PETALING, DAERAH PETALING,
SELANGOR
Soil NailPUCHONG GATEWAY
DEVELOPMENT S/B
534,300.00Apr 2009 - June 2009
CADANGAN PROJEK DOUBLE ROAD FRONTAGE DI BELAKANG KG. CINA, KUALA
TERENGGANU
Micro PilesKUMPULAN LIZIZ S/B896,971.00Apr 2009 - Aug 2009
PROPOSED 4 & 5 STOREY SHOP OFFICE, JALAN PANTAI BARU, K.L FOR UDA HOLDING
BHD
Bored PilesRAMADEON
CONSTRUCTION S/B
1,247,148.30June 2009 - Sept 2009
PROPOSED EXECUTION AND COMPLETION OF PILING WORKS TO PROPOSED MIXED
DEVELOPMENT
Driven PilesSetia Promenade Sdn Bhd199,305.00July 2009 - Oct 2009
PROPOSED SLOPE STABILISATION WORKS FOR BUNGALOW LOT NO.57, PUNCAK
SETIAWANGSA, KUALA LUMPUR
Micro Piles, Soil NailRAMADEON
CONSTRUCTION S/B
312,500.00Oct 2009 - Dec 2009
CADANGAN MEMBINA 1 UNIT RUMAH BERASINGAN 3 TINGKAT DI ATAS LOT 22591,
NO.19, JALAN DESA BUDIMAN, DESA PARKCITY, KL
Micro PilesYCM CONSTRUCTION
S/B
245,200.00Jan 2010 - Feb 2010
CADANGAN PEMBANGUNAN 2 UNIT KEDAI/PEJABAT 5 TINGKAT DENGAN 1 TINGKAT
TEMPAT LETAK KERETA BAWAH TANAH DI ATAS LOT PT8-PT11, JALAN IPOH, KUALA
LUMPUR
Bored PilesNLY Development Sdn Bhd570,000.00Feb 2010 - Mar 2010
PROPOSED SLOPE STABILISATION WORKS FOR JALAN KINRARA 6B AT BANDAR
KINRARA, SELANGOR
Soil Nail, Guniting,
Horizontal Drain
SERI MURNI
RESOURCES S/B
600,000.00Mar 2010 - Feb 2011
PROPOSED RETIFICATION WORK FOR IPD GOMBAKRetaining wall, Slope
Stabilisation
DEKAT BINA S/B424,630.05Mar 2010 - Apr 2010
CADANGAN MEMBINA DAN MENYIAPKAN SATU (1) BLOK TIGA (3) TINGKAT BANGUNAN
TAMBAHAN BILIK DARJAH DAN KERJA-KERJA BERKAITAN DI SEKOLAH RENDAH AGAMA
BUKIT SENTOSA, DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN.
General ConstructionJKR Hulu Selangor2,288,832.00May 2010 - June 2011
CADANGAN MEMBINA DAN MENYIAPKAN 18 BILIK DARJAH SEKOLAH KEBANGSAAN
KLEBANG JAYA, MENGGUNAKAN INDUSTRIALISED BUILDING SYSTEM (IBS), DI ATAS
LOT2597, MUKIM ULU KINTA, PERAK
Micro PilesARTICORP PILING S/B1,206,950.49Jun 2010 - Aug 2010
PROPOSED CAVITY TREATMENT WORK AT SUNWAY CORPORATE TOWERRock Probing &
Grouting Work
SUNWAY CITY BERHAD2,832,230.00Jun 2010 - Nov 2010
PROPOSED REFURBISHMENT OF UE3 SHOPPING MALL ON PART OF LOT PT.4, SECTION
91A, JALAN LOKE YEW, KL
Micro PilesSERI MURNI
RESOURCES S/B
1,542,961.50Jul 2010 - Mar 2011
PROPOSED SLAB STRENGTHENING AT AMD PLANT, CYBERJAYAMicro PilesCRITICAL SYSTEM
SPECIALIST S/B
160,000.00July-10
CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH RUMAH BANGLO 2 1/2 TINGKAT,
BESERTA TEMBOK DAN KOLAM RENANG DI ATAS LOT 43389, (PT 11501), NO. 22, JALAN
DAMAI, MUKIM PETALING CHERAS, WILAYAH PERSEKUTUAN.
Jack-In PilesTDL CONSTRUCTION
SDN BHD
134,840.00July 2010
PROPOSED MICROPILE FOR REMEDIAL WORKS FOR PERAI LATERAL STATION FOR
TRANSMISSION OPERATION DIVISION
Micro PilesPERNIAGAAN AZRAK S/B1,037,200.00Oct 2010 - Jan 2011
PROPOSED 2 STOREY BUNGALOW WITH BASEMENT ON LOT PT774, NO. 4, JALAN
U1/12G, SEKSYEN U1, SHAH ALAM.
Jack-In PilesINTIPAC SDN BHD215,944.00Oct 2010 - Nov 2010
PROPOSED DEVELOPMENT ON LOT 163, MUKIM BATU, DAERAH GOMBAK, SELANGORSoil Nail, Guniting,
Horizontal Drain
LOH & LOH
CONSTRUCTIONS S/B
1,998,150.00Nov 2010 - Jan 2011
CADANGAN TAMBAHAN DAN PINDAAN KEPADA SEBUAH RUMAH DI PLOT 275, DESA
AMAN, BATU 11, JALAN KUALA SELANGOR, SUNGAI BULOH UNTUK TETUAN TAN AH MOI
General ConstructionTan Ah Moi321,195.00Nov 2010 - Sept 2011
CADANGAN MEMBINA DAN MENYIAPKAN KLINIK KESIHATAN & KUARTERS, JERANTUT
PAHANG
Micro PilesJabatan Kerja Raya (JKR)2,408,265.00Dec 2010 - Mar 2011
CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT DI ATAS LOT271 COUNTRY
HEIGHT DAMANSARA
Micro Piles & Soil
Nailing Works
Mr. Jan Hofstede & Mrs.
Ineke Adriana Potsma
500,000.00Jan 2011 - Apr 2011
CADANGAN MEMBINA SATU BLOK PANGSAPURI KOS SEDERHANA 8 TINGKAT DI ATAS
LOT781 SEKSYEN 67, JALAN INAI KUALA LUMPUR
Micro PilesWong Yee Choon & Sons
Realty S/B
1,052,916.00Jan 2011 - May 2011
CADANGAN PROJEK PENUTUPAN SELAMAT DAN PEMULIHAN 16 TAPAK PELUPUSAN
SISA PEPEJAL DI SEMENANJUNG MALAYSIA SECARA 'DESIGN & BUILD' (BUKIT PALONG)
Driven PilesCypark Resources469,212.00Feb 2011 - June 2011
CADANGAN MEMBINA DAN MENYIAPKAN JEJANTAS BERBUMBUNG UNTUK STESEN LRT
PWTC DI WILAYAH PERSEKUTUAN KUALA LUMPUR
Micro PilesAked Selasih Corporation
S/B
515,400.00Feb 2011 - Apr 2011
PROPOSED CAVITY TREATMENT FOR SLG JALAN TUN RAZAK KUALA LUMPURCavity GroutingSunway Geotechnics S/B1,761,940.00Mar 2011 - Aug 2011
PROPOSED SOIL INVESTIGATION WORK AT LOT 53687 JALAN 109F TAMAN DANAU DESA
KUALA LUMPUR
Guniting WorksSunway Geotechnics S/B154,865.00Mar 2011 - May 2011
CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT DENGAN 2 TINGKAT DI
BAWAH PARAS JALAN BESERTA TEMBOK PENAHAN DAN KOLAM RENANGAN DI ATAS
LOT PT 24061 & LOT PT 24062 JALAN JEMERANG COUNTRY HEIGHTS DAMANSARA (LOT
153 & 154)
Micro Piles & Soil
Nailing Works
Vista usage S/B3,302,669.00Apr 2011 - Aug 2011
PROPOSED SLOPE PROTECTION FOR LOWER BASEMENT AT RC4 SUNWAY SOUTH
QUAY
Guniting WorksSunway Geotechnics S/B221,500.00May 2011
PROPOSED MICROPILE FOR SEMI-D SHOP LOT AT PRECINCT 1 SETIA ALAMMicro PilesSunsuria Construction S/B335,910.00May 2011 - Jun 2011
CADANGAN MEMBINA SEBUAH RUMAH BANGLO 3 TINGKAT BESERTA 1 UNIT KOLAM
RENANG DI ATAS NO.1, PT30056, (HSD 97870), JALAN TR 6/1, TROPICANA GOLF AND
COUNTRY RESORT, 47410UKIM SUNGAI BULUH, DAERAH PETALING, PETALING JAYA,
SELANGOR DARUL EHSAN UNTUK MR TAN CHEE KANG
Jack-In PilesMr Tan Chee Kang99,278.00May 2011 - June 2011
PROPOSED MICROPILING WORKS FOR THE CONSTRUCTION AND COMPLETION NOF
FACILITIES WORKS (PACKAGE A) FOR THE KELANA JAYA (KLJ) EXTENSION LINE
Micro PilesTrans Resources
Corporation S/B
2,692,590.00May 2011 - Sep 2011
PROPOSED DEVELOPMENT ON LOT 62523 BANDAR SRI DAMANSARASoil Nailing, Guniting
& Horizontal Drain
Works
Loh & Loh construction S/B138,790.00Jun 2011 - Aug 2011
CADANGAN MEMBINA SEBUAH RUMAH BANGLO DI ATAS LOT 153 & 154, COUNTRY
HEIGHTS DAMANSARA FOR VISTA USAGE SDN BHD.
Micro Piles & Soil
Nailing
Vista Usage Sdn Bhd847,311.44June 2011 - Aug 2011
CADANGAN MEMBINA SEBUAH RUMAH BANGLO 3 TINGKAT DAN 1 TINGKAT DI BAWAH
PARAS JALAN SERTA KOLAM RENANG DAN SEBUAH PONDOK PENGAWAL DI ATAS LOT
PT117, JALAN TIJANI, BUKIT TUNKU, MUKIM KUALA LUMPUR
Micro Piles,
Eartwork, RC
Retaining wall &
Piles Cap
GMC Sdn Bhd2,638,795.00June 2011 - Nov 2011
UNDERPINNING MICROPILE WORKS ON EXISTING PILECAPS AND COLUMNS WITH
STRENGTHENING WORKS AT JAYA 1, JALAN UNIVERSITI, SELANGOR
Micro PilesSunway South Quay Sdn
Bhd
447,097.00Jul 2011 - Aug 2011
CADANGAN PROJEK PENUTUPAN SELAMAT DAN PEMULIHAN 16 TAPAK PELUPUSAN
SISA PEPEJAL DI SEMENANJUNG MALAYSIA UNTUK "LEACHTE TREATMENT PLANT" DI
JALAN JABOR-JERANGAU, MUKIM SUNGAI KARANG, DAERAH KUANTAN, PAHANG
DARUL MAKMUR
Driven PilesCYPARK RESOURCES
BHD
647,521.00Aug 2011 - Sept 2011
CADANGAN PEMBAIKAN RUNTUHAN TEMBOK SG. PENCHALA YANG MERENTANGI LOT
20198, KONDOMINIUM KEN 3, JALAN SS2/72, PETALING JAYA, SELANGOR.
Sheet Piles, Strutting
& Misc
LUBOK GONG
ENTERPRISE
1,385,590.00Sept 2011 - Nov 2011
PROPOSED SLOPE STABILISATION WORKS FOR CADANGAN PEMBANGUNAN KEDIAMAN
YANG MENGANDUNGI 34 UNIT RUMAH BANDAR 3 1/2 TINGKAT DI ATAS LOT PT6595
TAMAN SRI HARTAMAS - KIARA HILL
Slope StabilisationSunway Geotechnics S/B815,000.00Sep 2011 - Dec11
PROPOSED CONSTRUCTION OF SUNWAY PYRAMID 3 - MICROPILING WORKSMicro PilesSUNWAY PYRAMID497,781.46Oct 2011
PROPOSED CONSTRUCTION OF SUNWAY PYRAMID 3 - TEMPORARY GROUND ANCHOR
WORKS
Ground Anchor
Works
SUNWAY PYRAMID1,282,200.00Oct 2011 -Feb 2012
PROPOSED CONSTRUCTION OF SUNWAY PYRAMID 3 - GUNITING WORKSGuniting WorksSUNWAY PYRAMID229,460.00Oct 2011
PROPOSED CONSTRUCTION OF SUNWAY PYRAMID 3 - SLOPE PROTECTION WORKSSlope Protection
Works
SUNWAY PYRAMID367,880.00Oct 2011
CADANGAN PEMASANGAN SISTEM TENAGA BOLEH DIPERBAHARUI DI TAPAK
PELUPUSAN PAJAM, NEGERI SEMBILAN
Driven PilesCYPARK SURIA (PAJAM)
SDN BHD
217,397.00Oct 2011 - Nov 2011
UNVERSITI UTARA MALAYSIA: FASA 1 – 1 BLOK BANGUNAN FAKULTI PENGAJIAN
ANTARABANGSA DAN 1 BLOK GUGUSAN DEWAN KULIAH (PILING WORKS)
Micro PilesORIENTAL UNITY SDN
BHD
2,945,280.40Nov 2011 - Jun 2012
CADANGAN MEROBOH BANGUNAN RUMAH KEDAI 3 TINGKAT SEDIADA DAN MEMBINA
BANGUNAN SAMBUNGAN 9 1/2 TINGKAT DI ATAS LOT 185 SERTA TAMBAHAN DAN
PERUBAHAN PADA BANGUNAN HOTEL 9 1/2 TINGKAT ( HOTEL FIRST BUSINESS)
SEDIADA DI ATAS LOT PT.71, SEKSYEN 47, JALAN DATO' HAJI EUSOFF, KUALA LUMPUR
UNTUK TETUAN NG KOH HENG & SONS SDN BHD
Micro PilesMawar Abadi (M) Sdn Bhd492,009.40Jan 2012 - Sep 2012
PROPOSED CONSTRUCTION AND COMPLETION OF ' CADANGAN PEMBANGUNAN DI
ATAS LOT PT 424 & LOT 425, PERSIARAN TROPICANA, MUKIM SG. BULUH UNTUK
TETUAN TROPICANA BHD' (TROPICANA AVENUE)
Micro PileTROPICANA BHD1,236,187.19Jan 2012 - Jun 2012
CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI SERVIS 19-26 TINGKAT (376 UNIT) DI
ATAS LOT 2515, 2516, 2517, 2518 & 2519 DI ATAS SEBAHAGIAN LOT 2514 MINES RESORT
CITY, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR
Earthworks, Bored
Piles, CBP, Sheet
Pile, Soil Nail,
Injection Piles, Pile
Caps & Earthing
Bludream City
Development Sdn Bhd
23,324,000.00Mar 2013 - Oct 2014
CADANGAN MEMBINA DAN MENYIAPKAN PEMBANGUNAN BERCAMPUR FASA 1 DI ATAS
SEBAHAGIAN LOT 52582 & 52581, MUKIM SG BULOH, DAERAH PETALING, JLN
PERSIARAN SURIAN, KOTA DAMANSARA, PJU 3, PETALING JAYA, SELANGOR
Earthworks, Bored
Piles, CBP, Ground
Anchor, Pile Caps,
Lowest Slab &
Earthing
Tropicana Indah S/B16,900,000.00Jul 2013 - Apr 2014
CADANGAN PEMBINAAN 1 BLOCK PANGSAPURI PERKHIDMATAN 30 TINGKAT DENGAN 1
TINGKAT BAWAH TANAH DI ATAS NO. 2 (LOT 33429), PERSIARAN BUKIT RAHMAN PUTRA
1, SEKSYEN U20, 40160 SHAH ALAM UNTUK TETUAN NLY VENTURES SDN BHD
Bored PileNLY VENTURES SDN
BHD
1,130,570.30Jul 2013 - Dec 2013
PROPOSED DEVELOPMENT OF 42 UNIT RUMAH MAMPU MILIK DAN 140 UNIT
APARTMENT BESERTA KEMUDAHAN-KEMUDAHAN ASAS DAN TEMPAT LETAK KERETA
DI ATAS PT 18255, MUKIM HULU KELANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN
FOR M/S TWIN RIDGE SDN BHD
Bored PileTwin Ridge Sdn Bhd1,920,898.10Jun 2014 - Nov 2014
PROPOSED DEVELOPMENT OF THEME PARK ON PLOT E & F AT ZON 6, BANDAR MERU
RAYA, MUKIM HULU KINTA, DAERAH KINTA, IPOH, PERAK DARUL RIDZUAN FOR TETUAN
ANIMATION THEME PARK SDN BHD
Driven Piles & Pile
Cap Works
ANIMATION THEME
PARK SDN BHD
6,350,000.00Nov 2014 - Sept 2015
CADANGAN MEMBINA SEBUAH SERVICE APARTMENT 34 TINGKAT DI ATAS LOT 2943,
2944 DAN 2945, JALAN RAJA ABDULLAH, SEKSYEN 41, MUKIM BANDAR KUALA LUMPUR,
WILAYAH PERSEKUTUAN KUALA LUMPUR (PILING WORKS)
Bored Pile, Cavity
Treatment
SAFUAN CENTER SDN
BHD
7,640,855.00Jan 2015 - May 2016
CADANGAN MEMBINA RUMAH SESEBUAH 4 TINGKAT DI ATAS LOT PT.576 JALAN 9/5D
SEKSYEN 9, 40100 SHAH ALAM SELANGOR DARUL EHSAN UNTUK SEE CHIN YAP
Micro PileSEE CHIN YAP328,990.00Apr 2015 - Jun 2015
PROJECT MASS RAPID TRANSIT LEMBAH KELANG: JAJARAN SUNGAI BULOH - KAJANGBored Pile, Reverse
Circulation Bored
Pile, Horizontal Drain
MASS RAPID TRANSIT
CORPORATION SDN
BHD
950,000.00May 2015 - Jun 2015
PROPOSED BEAUTIFICATION WORKS UNDER NKEA FOR "GREATER KUALA LUMPUR/
KLANG VALLEY" RIVER OF LIFE (ROL) PROJECT
Micro PileEKOVEST1,600,260.00May 2015 - Mar 2016
INFRASTRCTURE WORKS FOR CADANGAN MEMBINA DAN MENYIAPKAN JAMBATAN
MELINTAS JALAN REKO DAN LANDASAN KERETAPI KTM YANG MENGHUBUNGKAN
PERSIARAN BANGI DENGAN CADANGAN PEMBANGUNAN BERCAMPUR KAJANG 2 DI
MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR
Bored PileSRIJANG KEMAJUAN
SDN BHD
2,958,169.40July 2015 - Nov 2015
CADANGAN PEMBANGUNAN PERUMAHAN YANG MENGANDUNGI RUMAH TERES 1
TINGKAT, 22’X70’ (187 UNIT), RUMAH TERES 2 TINGKAT, 20’X67.5’ (62 UNIT), RUMAH
TERES VILLA 2 TINGKAT, 42’X44’ (34 UNIT), 2 UNIT PENCAWANG ELEKTRIK DAN 1 UNIT
PONDOK PENGAWAI, DI ATAS PT 115849 HSD 45813 (LOT ASAL PT 160078),
KEMPADANG, MUKIM KUALA KUANTAN, DAERAH KUANTAN, PAHANG DARUL MAKMUR
Driven PileADENLAND (KUANTAN)
SDN BHD
1,600,000.00Oct 2015 - Jan 2016
PROPOSED MICROPILING WORKS FOR CADANGAN PEMBANGUNAN 1 BLOK
PANGSAPURI KEDIAMAN 31 TINGKAT (325 UNIT) BESERTA VILLA (7 UNIT), 7 TINGKAT
PODIUM LETAK KERETA ARAS BAWAH DAN KEMUDAHAN PENDUDUK DI ATAS LOT
36183 DAN SEBAHAGIAN LOT 14982, MUKIM PETALING, DAERAH KUALA LUMPUR, KL
(ASIANA AGRESIF)
Micro PileG-PILE SISTEM SDN BHD749,971.80Dec 2015 - Mar 2016
SLOPE IMPROVEMENT, STRENGHTENING WORKS AND MISCELLANEOUS EARTHWORK
FOR CADANGAN PEMBANGUNAN KEDIAMAN BERCAMPURAN DI ATAS LOT 16833-16835
(PT 4609-4611), 16836 DAN 16837 TAMAN MELAWATI, MUKIM SETAPAK, DAERAH
GOMBAK, SELANGOR DARUL EHSAN UNTUK TENTUAN ANGKASA GAGAH SDN BHD
(MELAWATI RIDGE) - ZONE 1
Slope Improvement
& Strengthening
Works, Earthworks
ANGKASA GAGAH SDN
BHD
5,805,973.98Sept 2015 - Jun 2016
PROPOSED SLOPE STABILISATION WORK FOR EXCEL CHEMICAL TRADING AT
PERSIARAN ASTANA, KAWASAN PERINDUSTRIAN BUKIT RAJA
Slope Stabilization
Works
TG TARGET SDN BHD7 99,980.00Mar 2016 - Jul 2016
PROPOSED MICROPILING WORKS FOR UPGRADING 132ft BRIDGE FOR TROPICANA HILL
KAJANG
Micro PileMAKNA SETIA SDN BHD8 24,221.89Mar 2016 - Aug 2016
PILING WORKS FOR CADANGAN MEROBOH RUMAH SESEBUAH TIGA TINGKAT DAN
MEMBINA SEMULA RUMAH SESEBUAH TIGA TINGKAT DI ATAS LOT 11305 DAN LOT 11307
MUKIM PETALING DAERAH KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
Micro PileCYLONIX GEOTECHNICS
SDN BHD
567,952.00May 2016 - Sep 2016
CADANGAN MEMBINA JEJAMBAT FASA-1 DI ATAS REZAB JALAN DATARAN BANDAR
UTAMA YANG MENGHUBUNGI PROJEK PEMBANGUNAN PT37650 KE DATARAN BANDAR
UTAMA, PJU 6, BANDAR UTAMA, DAERAH PETALING UNTUK TETUAN BANDAR UTAMA
CITY ASSETS SDN BHD
Bored Pile, Handdug
Caisson
MAKNA SETIA SDN BHD4,068,996.00Sept 2016 - Sept 2017
CADANGAN MEMBINA JEJAMBAT FASA-1 DI ATAS REZAB JALAN DATARAN BANDAR
UTAMA YANG MENGHUBUNGI PROJEK PEMBANGUNAN PT37650 KE DATARAN BANDAR
UTAMA, PJU 6, BANDAR UTAMA, DAERAH PETALING UNTUK TETUAN BANDAR UTAMA
CITY ASSETS SDN BHD
Micro PileMAKNA SETIA SDN BHD191,180.37Oct 2016 - Jan 2017
CADANGAN 'INTEGRATED WATER SUPPLY SCHEME' (IWSS) DARI KOLAM AIR BUKIT
MAXWELL (BARU) KE KOLAM AIR PANTAI KOMPLEKS DAN BERAKHIR DI PERSIMPANGAN
JALAN PANTAI MURNI/JALAN PANTAI PERMAI 13
Bored PileLOO SEK CHOY
PLUMBING
CONSTRUCTION SDN
BHD
400,000.00Sept 2016 - Jan 2017
CADANGAN PINDAAN KEPADA PERINTAH PEMBANGUNAN BERTARIKH 4 SEPTEMBER
2003 BAGI CADANGAN PELAN SUSURATUR YANG TELAH DILULUSKAN PADA 4
SEPTEMBER 2003 DI ATAS LOT PT478, PT479, PT480, PT481, PT482, PLOT C1 DAN PLOT
C2, JALAN COCHRANE, SEKSYEN 90, BANDAR KUALA LUMPUR UNTUK TETUAN
BOUSTEAD IKANO SDN BHD
Contiguous Bored
Pile, Ground Anchor
CYLONIX GEOTECHNICS
SDN BHD
546,000.00Jan 2017 - Apr 2017
PILING WORKS FOR CADANGAN MEROBOH SEBAHAGIAN BANGUNAN SEKOLAH
SEDIADA DAN MEMBINA SEMULA SATU BLOK 3 TINGKAT BANGUNAN SEKOLAH DI
KAWASAN SEKOLAH KEBANGSAAN SUNGAI BESI INDAH, SERI KEMBANGAN, MUKIM
PETALING, DAERAH PETALING, SELANGOR FOR TETUAN KEMENTERIAN PELAJARAN
MALAYSIA
Injection PilesBLUDREAM CITY
DEVELOPMENT SDN
BHD
264,000.00Mar 2017 - Apr 2017
MEMBINA LEBUH RAYA KOTA BHARU KE KUALA KRAI, PAKEJ 2A KADOK KE KETEREH,
KELANTAN (BRIDGE OVER JALAN KADOK AT CH. 14506.000)
Bored PileCHENGALJATI SDN BHD632,564.00Mar 2017 - Jul 2017
PROJEK PENSWASTAAN LEBUHARAYA BERTINGKAAT SUNGAI BESI – ULU KELANG.
(“SUKE”) PACKAGE SUKE: CA1 – CONSTRUCTION OF MAINLINE AND OTHER
ASSOCIATED WORKS FROM CH. 0 TO CH.2400
Bored PileCHENGALJATI SDN BHD10,185,004.00Apr 2017 - Oct 2018
M&E PLANTROOM FOR TM COMPLEX BRICKFIELD ON LOT 226, SECTION 55 JALAN TUN
SAMBATHAN BANDAR KUALA LUMPUR WILAYAH PERSEKUTUAN KUALA LUMPUR
Bored PileCRITICAL SYSTEM
SPECIALIST SDN BHD
652,073.20Aug 2017 - Sept 2017
CADANGAN MEMBINA JEJAMBAT FASA-2 DI ATAS REZAB JALAN DATARAN BANDAR
UTAMA YANG MENGHUBUNGI PROJEK PEMBANGUNAN PT37650 KE DATARAN BANDAR
UTAMA, PJU 6, BANDAR UTAMA, DAERAH PETALING UNTUK TETUAN BANDAR UTAMA
CITY ASSETS SDN BHD (PHASE 2)
Bored Pile, Handdug
Caisson
MAKNA SETIA SDN BHD2,686,338.92Oct 2017 - June 2018
CADANGAN MEMPERTINGKATKAN JALAN AYER JERNEH DAN JALAN AYER KEROH
SERTA KAWASAN SEKITARNYA DI KUALA LUMPUR
Micro PileJUARA CAHAYA SDN
BHD
416,220.00Mar 2018 - May 2018
CADANGAN PENDIRIAN BANGUNAN KOMERSIAL 20 TINGKAT DAN 1 TINGKAT SEPARA
BAWAH DI ATAS LOT 1259, BANDAR COUNTRY HOMES, MUKIM RAWANG, DAERAH
GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR DARUL EHSAN UNTUK
TETUAN AUDIO PHONAR ELECTRONIC SDN BHD
Driven PileREBANA MAJU SDN BHD2,756,116.60Apr 2018 - Aug 2018
PROJEK PENSWASTAAN LEBUHARAYA BERTINGKAAT SUNGAI BESI – ULU KELANG.
(“SUKE”) PACKAGE SUKE: CB5 – SECTION B, CHERAS TO ULU KELANG
Micro PileBBSB HOLDINGS SDN
BHD
497,179.90Apr 2018 - Oct 2018
CADANGAN PEMBANGUNAN MEMBINA KOMPLEKS PERNIAGAAN DI ATAS PT3276
SELUAS 5.66 EKAR, MUKIM TANAH RATA, DAERAH CAMERON HIGHLAND, PAHANG
DARUL MAKMUR UNTUK TETUAN CASA INSPIRASI SDN BHD
Pre-boredG-PILE SISTEM SDN BHD445,000.00May 2018 - Sept 2018
BRIDGEWORKS FOR PROPOSED LEBUHRAYA PUTRAJAYA TO KLIA (MEX 2) –
COMMENCING FROM PUTRAJAYA INTERCHANGE AND TERMINATING AT KLIA
Bored PileBBSB HOLDINGS SDN
BHD
15,765,489.30Jan 2018 - Jun 2019
ENTRANCE BRIDGE TO BAGI CADANGAN PEMBANGUNAN KOMERCIAL DI ATAS LOT
72241 DAN LOT PT 194, JALAN SS 8/2, KELANA JAYA, MUKIM BANDAR PETALING JAYA,
DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN SUNWAY SERENE SDN
BHD
Driven Pile & Toe
Pin
MAKNA SETIA SDN BHD1,227,801.20Mar 2019 - Oct 2019
CADANGAN TAMBAHAN 1 TINGKAT BASEMENT & 8 TINGKAT HOSPITAL SERTA
UBAHSUAI BANGUNAN HOSPITAL SEDIA ADA BESERTA RUANG PERNIAGAAN, BILIK
MEKANIKAL DAN ELEKTRIKAL DI ATAS LOT GM 263 LOT 2417 DAN GM 2887 LOT 9302
(LOT LAMA HSM 3442 LOT PT5552), MUKIM BUKIT BARU, DAERAH MELAKA TENGAH,
HANG TUAH JAYA, MELAKA UNTUK TETUAN HOSPITAL PANTAI AYER KEROH SDN BHD
Bored PileIREKA ENGINEERING &
CONSTRUCTION SDN
BHD
1,859,223.30Nov 2018 - Jan 2019
CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS SEBUAH BANGUNAN GUDANG 1
TINGKAT DAN PEJABAT 3 TINGKAT SEDIADA DI ATAS LOT 38533 (PT12190), JALAN
DELIMA 1/3, TAMAN SUBANG TEKNOLOGI TINGGI, MUKIM DAMANSARA, DAERAH
PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN U MOBILE SDN BHD
Injection PilesCRITICAL SYSTEM
SPECIALIST SDN BHD
772,085.00Dec 2018 - Jan 2019
CADANGAN MEMBINA JEJAMBAT FASA-3 DI ATAS REZAB JALAN DATARAN BANDAR
UTAMA YANG MENGHUBUNGI PROJEK PEMBANGUNAN PT37650 KE DATARAN BANDAR
UTAMA, PJU 6, BANDAR UTAMA, DAERAH PETALING UNTUK TETUAN BANDAR UTAMA
CITY ASSETS SDN BHD (PHASE 3)
Bored PileMAKNA SETIA SDN BHD1,721,182.95Jan 2019 - May 2019
ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU, SECTION 5, KULAI TO
KEMPAS BARU
Bored PileJUANG ANTARA BINA
SDN BHD
3,932,801.95Feb 2019 - Oct 2019
PERMOHANAN PELAN KERJA TANAH, JALAN DAN PARIT DI BAWAH AKTA 133, BAGI
CADANGAN PEMAJUAN PERUMAHAN DAN PERDAGANGAN DI ATAS, SEBAHAGIAN LOT
1197 MUKIM SUNGAI SEGAMAT, DAERAH SEGAMAT, JOHOR DARUL TAKZIM UNTUK
TETUAN NICE SKYLINE SDN BHD
Bored PileJUANG ANTARA BINA
SDN BHD
323,526.40Sep 2019 - Nov 2019
ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU, SECTION 5, KULAI TO
KEMPAS BARU (CONTIGUOUS BORED PILEA AT B13-06a)SUNGAI SEGAMAT, DAERAH
SEGAMAT, JOHOR DARUL TAKZIM UNTUK TETUAN NICE SKYLINE SDN BHD
Contiguous Bored
Pile
SYARIKAT PEMBENAAN
YEOH TIONG LAY SDN
BHD
760,125.73Dec 2019 - Jan 2020
CADANGAN MEROBOH BANGUNAN2 TINGKAT DAN MEMBINA SEMULA BANGUNAN
SEKOLAH DAN PERSONAGE 6 TINGKAT BERSERTA 1 TINGKAT MEZZANINE DAN 1 SUB
BASEMENT TEMPAT KERETA DI ATAS LOT 230, JALAN PUDU LAMA, SEKSYEN 19,
WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN TAMIL EPISCOPALIAN
MINISTER
Bored Pile & Micro
Pile
IDAMAN ASAL SDN BHD1,204,877.90Feb 2020 - Jul 2020
CADANGAN PEMBANGUNAN PERUMAHAN PENJAWAT AWAM MALAYSIA (PPAM) 41
TINGKAT DI ATAS LOT 29343, OFF JALAN KAMPUNG BANDAR DALAM, MUKIM SETAPAK,
DAERAH KUALA LUMPUR UNTUK TETUAN INTRA ALLIANCE CONSULT SDN BHD
Bored PileCITY PILING &
CONSTRUCTION SDN
BHD
2,000,880.00Jun 2020 - Oct 2020
CADANGAN MEMBINA 12 UNIT PEJABAT 3 TINGKAT, 1 UNIT KEDAI PEJABAT 4 TINGKAT, 1
UNIT KEDAI PEJABAT 3 TINGKAT, 1 UNIT BESMEN DI ATAS LOT 1894, JALAN SEMENYIH,
MUKIM SEMENYIH, DAERAH HULU LANGAT
Driven PileTCF CONSTRUCTION
SDN BHD
328,066.60Jun 2020 - Aug 2020
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING,
COMMISSIONING AND MAINTENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM
GEMAS TO JOHOR BAHRU - SECTION 3 (CONTIGUOUS BORED PILEA AT RUB-02)
Contiguous Bored
Pile
SYARIKAT PEMBENAAN
YEOH TIONG LAY SDN
BHD
1,199,393.33Jul 2020 - Sep 2020
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS 42 TINGKAT DI ATAS LOT
481520 (DAHULUNYA LOT 51865), JALAN SELANGAT, MUKIM KUALA LUMPUR, WILAYAH
PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN MKH DEVELOPMENT SDN. BHD (NEXUS
@ TAMAN PERTAMA)
Contiguous Bored
Pile
ABADI PILING SDN BHD804,723.60Feb 2021 - Sep 2021
CONSTRUCTION AND COMPLETION OF 1 BLOCK OF 10-STOREY CARPARK BUILDING ON
PART OF LOT 102078 (HSD 453151), PHASE 2, JALAN DESA TEBRAU, TAMAN DESA
TEBRAU, MUKIM TEBRAU, DISTRICT OF JOHOR BAHRU, JOHOR DARUL TAKZIM FOR
MESSRS IKANO JOHOR JAYA SDN BHD
Injection Piles with
Pre-bored
IKANO JOHOR JAYA SDN
BHD
2,680,000.00Apr 2021 - Nov 2021
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING,
COMMISSIONING AND MAINTENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM
GEMAS TO JOHOR BAHRU - SECTION 5 (GENERAL ARRANGEMENT OF PIER
PROTECTION AT BRR35 & BRR36)
Bored PileSYARIKAT PEMBENAAN
YEOH TIONG LAY SDN
BHD
1,650,000.00Sep 2020 - June 2022
DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING,
COMMISSIONING AND MAINTENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM
GEMAS TO JOHOR BAHRU - SECTION 5 (B15 – 07a)
Contiguous Bored
Pile, Soil Nail &
Gunite Wall
SYARIKAT PEMBENAAN
YEOH TIONG LAY SDN
BHD
2,574,670.49Aug 2021 - May 2022
CADANGAN MEROBOH BANGUNAN KONDOMINIUM 6 TINGKAT YANG SEDIA ADA DAN
MEMBINA SEMULA SATU BLOK PEJABAT 31 TINGKAT DENGAN 1 TINGKAT BESMEN DI
ATAS LOT 158 SEKSYEN 43, PERSIARAN LIDCOL, OFF JALAN YAP KWAN SENG DALAM
BANDARAYA KUALA LUMPUR UNTUK TETUAN SOLITAIRE SUITES SDN BHD
Bored PileCYLONIX GEOTECHNICS
SDN BHD
1,151,802.35Dec 2021 - June 2022
PERMOHONAN UNTUK MEMBINA PERSIMPANGAN BERTINGKAT DARI LEBUHRAYA KE
TAPAK CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS LOT 68054 (PT 8959), MUKIM
TANJONG 12, DAERAH KUALA LANGAT DAN 2 JEJAMBAT MERINTASI LEBUHRAYA, OLEH
TETUAN GAMUDA LAND (T12) SDN. BHD.
Hammer Driven Pile
with Pre-bored
(SP700, SP800 &
SP900)
MUJUR MINAT SDN BHD1,586,834.00Sep 2020 - Jan 2023
PROPOSED MICROPILING WORKS FOR STATION 26 (OSD1 & CABLE DUCT BANK) AND
STATION 25 (CABLE DUCT BANK)- JOHAN SETIA STATION
Micro PileCWM Sdn Bhd5 ,536,239.20Mar 2021 - Sep 2022
CADANGAN PEMBANGUNAN DI ATAS SEBAHAGIAN LOT PT 1351 (PARCEL CP2), JALAN
LAGOON SELATAN, SUNWAY SOUTH QUAY, BANDAR SUNWAY, DAERAH PETALING,
SELANGOR.
Soil Nail & Micro PileSUNWAY GEOTECHNICS
SDN. BHD
5 ,930,345.00Oct 2021 - Sep 2022
CADANGAN PEMBANGUNAN KILANG DI ATAS PT 878 [HSD224169] (LOT60769), PT 879
[HSD224170] (LOT60770) DAN PT 880 [HSD224171] (LOT60771), KAWASAN
PERINDUSTRIAN TAMAN TEKNOLOGI 2 (TECHPARK 2), BANDAR ENSTEK, MUKIM LABU,
DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS, UNTUK TETUAN MAC FOOD
SERVICES (M) SDN. BHD.
Driven PileMAC FOOD SERVICES
(M) SDN. BHD
4,850,000.00Dec 2021 - May 2022
HOVID WAREHOUSE, IPOH - MICROPILING WORKSMicro PileCYLONIX SDN BHD689,620.00Jun 2022 Aug 2022
CENTRAL SPINE ROAD, KUALA LIPIS, PAHANGSlope StabilizationMERIT PARTNERS2 ,587,450.00Jul 2022 - Nov 2022
PROPOSED PILING WORKS (FOR CPO WASHING FACILITIES, GE MITIGATION PLANT AND
2 X 6000 MT TANK AREA), DEMOLITION WORK FOR EXISTING 2 X 5800 MT TANK
FOUNDATION AND RELOCATION OF RAINWATER HARVESTING TANK & DIESEL TANK AT
SIME DARBY OILS PORT KLANG REFINERY, LOT 27, PT234, LEBUH SULTAN MOHAMED I,
KAWASAN PERUSAHAAN PKNS FASA II, BANDAR SULTAN SULEIMAN, 42000 KLANG,
SELANGOR DARUL EHSAN
Bored PileCYLONIX GEOTECHNICS
SDN BHD
697,124.00Jul 2022 - Sep 2022
PEMBINAAN SEKOLAH BAHARU 24 BILIK DARJAH SERTA LAIN-LAIN KEMUDAHAN
SEKOLAH MENENGAH KEBANGSAAN JALAN SUNGAI BESI DI SALAK SELATAN, KUALA
LUMPUR
Bored PilePEMBINAAN ERAT
OPTIMA SDN BHD
2,748,960.00Jul 2022 - April 2023
PERMOHONAN UNTUK MEMBINA PERSIMPANGAN BERTINGKAT DARI LEBUHRAYA KE
TAPAK CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS LOT 68054 (PT 8959), MUKIM
TANJONG 12, DAERAH KUALA LANGAT DAN 2 JEJAMBAT MERINTASI LEBUHRAYA, OLEH
TETUAN GAMUDA LAND (T12) SDN. BHD.
Bored PileMUJUR MINAT SDN BHD1,200,000.00Oct 2022 - Mar 2023
CADANGAN PERSIMPANGAN BERTINGKAT MENGHUBUNGKAN CADANGAN
PEMBANGUNAN DENGAN LEBUHRAYA TUN DR. LIM CHONG EU
Bored PileMAKNA SETIA SDN BHD4,000,000.00Jul 2022 - Dec 2023
CADANGAN PEMBINAAN KEMUDAHAN RAWATAN ENAPCEMAR UNTUK LRA SEMBRONG
TIMUR DI DAERAH KLUANG DAN LRA KG TENGAH 1 & 2 DI DAERAH SEGAMAT, JOHOR
Micro PileTT WATER SDN BHD4,817,678.40Nov 2022 - Aug 2023
CADANGAN PERSIMPANGAN BERTINGKAT MENGHUBUNGKAN CADANGAN
PEMBANGUNAN DENGAN LEBUHRAYA TUN DR. LIM CHONG EU
Driven PileMAKNA SETIA SDN BHD209,506.00Feb 2023 - Aug 2023
CADANGAN PERSIMPANGAN BERTINGKAT MENGHUBUNGKAN CADANGAN
PEMBANGUNAN DENGAN LEBUHRAYA TUN DR. LIM CHONG EU
Rock Probing, Cavity
Treatment, Bored
Pile
ENQUEST
CONSTRUCTION SDN
BHD
1,703,131.41Feb 2023 - Jun 2023
PEMBANGUNAN PERNIAGAAN BERCAMPUR DI ATAS LOT 484, JALAN BK 5A/3, BANDAR
KINRARA, MUKIM PETALING, SELANGOR DARUL EHSAN UNTUK BOON KOON
COMMERCIAL SDN BHD
Earthworks,
Contiguous Bored
Pile, Bored Pile
MAKNA SETIA SDN BHD6,462,921.05Oct 2023 - Apr 2024
CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS 3 UNIT KILANG TERES 1 ½ TINGKAT
SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT 17106 (NO.7), PT 17107 (NO.9) & PT 17108
(NO.11), JALAN RAJAWALI 3, BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING,
DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK JCO IMMENSE MIRACLES SDN
BHD
Injection Pile -
Underpining
MAKNA SETIA SDN BHD50,000.00Aug 2024 - Aug 2024
BUNGALOW AT JALAN MERCHU, BUKIT TUNKU, 50480 KUALA LUMPURMicro PileCG INNOVATION SDN
BHD
451,659.20May 2024 - July 2024
CADANGAN PEMBANGUNAN 2 BLOK PANGPAPURI SUITE (KEDIAMAN) 48 TINGKAT (612
UNIT) YANG MENGANDUNGI BLOK A 38 TINGKAT (302 UNIT), BLOK B 39 TINGKAT (310
UNIT), 8 TINGKAT PODIUM TEMPAT LETAK KERETA, 1 TINGKAT SUB BESMEN TEMPAT
LETAK KERETA, KEMUDAHAN PENDUDUK, 1 UNIT PONDOK PENGAWAL, 1UNIT RUMAH
SAMPAH DAN 1 UNIT PENCAWANG ELEKTRIK DI ATAS LOT 3240 DAN LOT 260, JALAN
SUNGAI BESI, SEKSYEN 92, DAEAH KUALA LUMPUR, WILAYAH KUALA LUMPUR UNTUK
TETUAN FIAMMA PROPERTIES SDN BHD
Earthworks, Rock
Probing, Soldier Pile,
Bored Pile
MAKNA SETIA SDN BHD7,449,835.50Feb 2024 - Nov 2024
CADANGAN MENDIRIKAN 1 BLOK PANGSAPURI PERKHIDMATAN 41 TINGKAT YANG
TERDIRI DARIPADA 7 TINGKAT DAN 1 PARAS MEZZANINE BAGI TEMPAT LETAK
KENDERAAN SERTA RUANG ANCILLIARI, 30 TINGKAT PANGSAPURI PERKHIDMATAN (588
UNIT) DAN 3 TINGKAT BAGI M&E DAN RUANG ANCILLIARI DI ATAS LOT 10012, JALAN
SERI TANJUNG PINANG, BANDAR TANJONG PINANG, SEKSYEN 1, DAERAH TIMUR LAUT,
PULAU PINANG.
Injection PileMAKNA SETIA SDN BHD2,149,759.00Aug 2024 - Mar 2025
KLIA 2Injection PileHOU KEONG
CONSTRUCTION SDN
BHD
364,960.00Mar 2025 - Apr 2025
CADANGAN JAMBATAN PAIP AIR BAGI CADANGAN BEKALAN AIR BERSEPADU (IWSS)
HAWTHORDEN 2 UNTUK TENTUAN JELANG VISTA S/B, WARISAN RAJAWALI S/B, SDB
PROPERTIES S/B & MAXIMS CIRCLE DEVELOPMENT S/B.
Micro PileDYNIVEST PROGRESS
SDN BHD
120,200.00Mar 2025 - Apr 2025
CADANGAN PEMBANGUNAN 2 BLOK PEMBANGUNAN BERCAMPUR 69 TINGKAT
(MENARA A) & 22 TINGKAT (MENARA B) DI ATAS 8 TINGKAT PODIUM YANG TERDIRI
DARIPADA 1 TINGKAT LOBI UTAMA, 1 UNIT KEDAI DAN KEMUDAHAN AWAM (ARAS 1 & 2)
DAN 7 TINGKAT TEMPAT LETAK KERETA (ARAS 2 HINGGA ARAS 8) DENGAN 1 TINGKAT
TEMPAT LETAK KERETA BAWAH TANAH DI ATAS LOT-LOT 54, 74 DAN 192, SEKSYEN 44,
OFF JALAN AMPANG, KUALA LUMPUR UNTUK TETUAN FIAMMA LAND SDN BHD
Earthworks, Bored
Pile
MAKNA SETIA SDN BHD6,270,812.30Aug 2024 - June 2025
KLIA 2 (PHASE 2)Injection PileHOU KEONG
CONSTRUCTION SDN
BHD
232,480.00July 2025 - Sep 2025
CADANGAN PEMBANGUNAN BAGI KOMPLEKS PERNIAGAAN YANG MENGANDUNGI FASA
1 FREE COMMERCIAL ZONE, FASA 2 PASARAYA MEMBELI BELAH & FASA 3
PEMBANGUNAN AKAN DATANG DI ATAS LOT 10510 SEKSYEN 16 (PN 111686), JALAN
SYAHBANDAR, BANDAR PORT SWETTENHAM, MUKIM KLANG, DAERAH KLANG,
SELANGOR DARUL EHSAN
Bored PileAWANGSA PMC SDN
BHD
566,976.00June 2025 - Aug 2025

Frequently Asked Questions

We specialize in geotechnical and foundation engineering works, including piling, retaining structures, ground support, soil improvement, slope stabilization, and sub-structural works for civil, infrastructure, and general construction projects.

Our expertise covers a wide range of sectors such as commercial buildings, residential developments, infrastructure projects, and industrial facilities requiring strong and reliable foundation solutions.

UEC was incorporated in 2008 and is managed by a team of highly skilled professionals with extensive experience in geotechnical and foundation works. Over the years, we have successfully delivered numerous large-scale projects across Malaysia.

Our strength lies in combining professionalism, innovative technologies, and a dedicated workforce to deliver safe, high-quality, and cost-effective solutions with single-point responsibility for our clients.

Yes, safety and quality are at the core of our operations. We strictly adhere to uncompromised safety practices, industry standards, and quality control measures in every project we undertake.

You can reach out to us via our Contact Us page, email, or phone. Our team will be happy to assist you with inquiries, proposals, or consultation for your project needs.

Contact Information:

Phone

+6013-268 2118

Email Address

uecgeo@uec.com.my

Location

No. 29-3, Jalan Metro Perdana Barat 1, Taman Usahawan Kepong, 52100 Kuala Lumpur